home
news

Grid Study II published: New scenarios of Czech coal phase-out

share this article

What would happen to Czech power grid in 2030 if all coal power plants were shut down? Even without coal-fired generation it is possible to ensure stable electricity supply in the Czech Republic, proves a study which we publicly presented in May 2018. Now we introduce new additional scenarios to the study, again analysed by Energynautics.

New scenarios show that Czech power grid poses no obstacle to phase-out of all coal powered power plants, even under the following conditions:

  • Three weeks of extreme winter with temperatures well below - 15 °C
  • In case of unexpected phase-out of Dukovany nuclear power plant before 2030
  • Lowered potential for export in the other European countries (Poland, Germany and France)

Increase in power consumption due to development of electromobility and heat pump. The study concludes that grid stability poses no major obstacle for the transformation of Czech energy sector from coal to renewables. In includes also an overview of recommended measures, which could increase the ability of the grid to react to fluctuation in VTE and FVE production for individual scenarios. The measures comprise the possibility of energy accumulation in heating stations and biogas storage in biogas stations. These measures would increase the potential of these sources for generation dispatch management. Further improvement can be achieved through optimalization of CCGT turbines.

The study reacts to the current European drift from coal towards renewable energy. This trend often raises a question: could the substitution of coal power plants with sources which are highly dependant on weather threaten the stability and security of power supplies? This question is definitely appropriate - the share of renewables in the European union is 30 % and increasing. This growth in renewable energy is caused especially by solar and wind sources of energy and biomass. The study which is unique to the Czech environment shows that the options of Czech power grid do not stand in the way of further energy transformation.

The additional research was carried out by a renown German consulting company Energynautics, upon a request of Czech organizations – Glopolis, Frank Bold and Hnutí Duha (Friends of the Earth Czech Republic).

Czech Power Grid without Electricity from Coal by 2030
    (
8 MB
)

You may also like these news

Finalisation of European ESG reporting rules: CSRD adopted and standards published

The European Parliament has adopted the Corporate Sustainability Reporting Directive (CSRD), which clarifies transparency obligations for large companies operating in the EU on their sustainability impacts, risks, and opportunities. Pursuant to the CSRD, companies across all sectors will report against the European Sustainability Reporting Standards, which were developed by the European Financial Reporting Advisory Group (EFRAG), submitted to the European Commission and published on 22 November.

Alliance
3/7/2023

Civil Society Organisations Urge the European Commission to Adopt an Ambitious Set of Sector-Agnostic Reporting Standards

NGOs and civil society groups will only support an ambitious first set of sector-agnostic ESRS that closely builds on the EFRAG drafts adopted last November. They urge the Commission to follow EFRAG’s technical advice alongside 60+ companies and investors worth 651bn USD, and caution against making significant changes at this stage, as this would risk discrediting the process so far and undoing a good compromise.

Summary of the Turów case

Governments turning a blind eye to Illegal lignite mining in Turów: Local communities and the environment suffer.